Submitted by Sara Mendillo
(December 8, 2024) —Â The Connecticut Department of Transportation advises the following construction activities at the Haddam/East Haddam Swing Bridge (Route 82) for the upcoming week of December 8, 2024:
Overnight Bridge Closures
The contractor has scheduled overnight bridge closures this week as follows:
- Monday night (12/9/24) into Tuesday morning (12/10/24) – 7:00 p.m. to 6:00 a.m.
- Tuesday night (12/10/24) into Wednesday morning (12/11/24) – 7:00 p.m. to 6:00 a.m.
63-Hour Bridge Closure
A full bridge closure to vehicles, cyclists and pedestrians has been scheduled to begin on Sunday, December 15, 2024 at 8:00 p.m. It will be in effect until Wednesday, December 18, 2024 at 11:00 a.m. Inclement weather or other unforeseen circumstances could impact this scheduled closure. Any changes will be communicated in a timely manner.
Lane Closures
- Single lane closures on Route 82 will occur Monday through Friday from 9:00 a.m. to 3:00 p.m. within the project limits. Traffic flaggers will coordinate the alternating traffic sequence.
- Both lanes will be reopened and operational during peak traffic hours.
Marine Advisory
Boaters are advised that as of December 1, 2024, the Swing Bridge no longer opens for tall recreational vessels. Openings will resume on February 15, 2025.
Mariners are advised that the contractor’s suspended scaffold, previously removed to provide additional clearance for vessels, has been reinstalled.
The tide clearance board is recommended as the best reference for gauging clearance at time of passage. The board is located on the bulkhead at Goodspeed, and has been set to indicate the vertical clearance to the contractor’s suspended scaffold.
The bridge operator can be reached at 860-218-4973. Please be advised that this phone number is designated for marine use only.
Text Alerts
You can sign up for Text Alerts to receive notifications on bridge closures and re-openings, closure cancellations, and any emergency closures. To opt in, text the word SWINGBRIDGE to 888777. (Message and Data rates may apply). In addition to SMS messages, if you would like to receive Swing Bridge open/closed status notices via email or a voice call from Everbridge, please click here to enter the required information. Message and data rates may apply. Reply HELP for help, STOP to opt out.