Tylerville Roundabouts Project: Two-Week Lookahead August 6, 2024

Submitted by Sara Mendillo

(August 6, 2024) — The Connecticut Department of Transportation has provided a two-week lookahead for the Roundabouts project in the Tylerville section of Haddam:

Northern Roundabout
Drainage will continue to be installed from the Tylerville garage, moving toward the Northern Roundabout. This work will be completed during overnight hours.  Drivers should anticipate alternating one-way traffic along Route 154 for this work. However, much of the work is in the shoulder and the contractor has indicated that they may be able to maintain two lanes of traffic.  There is one major road crossing and catch basin in front of the Tylerville garage that will cause the most interference for traffic.

Southern Roundabout
The Southern Roundabout will continue to be very active.  Most of the work here will still occur off the roadway behind the barrier and pertain to the bridge construction.  The current orientation continues as the staging for the foreseeable future.  The biggest construction-related traffic impacts will be as follows:

  1. Truck traffic entering and exiting the site.
    • First side of the bridge footings are being poured this week so anticipate concrete truck traffic in/out of the site, but very minimal traffic interruption.
    • The contractor plans to start granite curbing installations along the Southern Roundabout approaches. Drivers should anticipate shoulder interruptions and occasional equipment crossings on Routes 82 and 154 during the day.
    • Material/Equipment Deliveries.
    • The contractor plans to start building up the sidewalks/approaches to the Southern Roundabout. The majority of this work should be off the road or in the shoulder.
  2. Night Work is expected at the Southern Roundabout in order to continue water main installation. This work will impact traffic, and it is likely to result in alternating one-way traffic on Route 154. The contractor needs to install new Ductile Iron Pipe for the town’s water main. According to the most recently submitted two-week lookahead, this work is expected for both weeks.

Note: The contractor is not allowed to impact traffic within the following time frames (within shifting stages):

Monday through Friday: 6:00 a.m. to 9:00 a.m. and 3:00 p.m. to 6:00 p.m.

Saturday and Sunday: 10:00 a.m. to 6:00 p.m.

All traffic patterns and/or project work are subject to change as necessary.  Construction of this nature requires flexibility as it requires both the coordination of many sub-contractors, and sequenced work.

Hot this week

Eversource Files for Lower Standard Service Supply Rate

Submitted by Sarah Paduano, Eversource Energy (May 19, 2025) ---...

New in Killingworth: From “Cooking Company” to “AristoKraft Kitchen”

By Clark Judge (February 4, 2026) --- In the spring...

A Tribute to Tom Grasso (1973-2026) Heroic Soldier, Teacher and Coach

By Phil Devlin (May 12, 2026) --- On June 10,...

HVFC Responds to Fiery Crash That Closed Route 9

By Olivia Drake, HVFC Public Information Officer (March 24, 2024)...

Memorial Service Announced for Haddam Man Found in Cockaponset State Forest

By Edith Pawlicki (October 14, 2024) --- A celebration of...

Chenzo’s Restaurant Wins “Best of the Shoreline” Award

By Sharon Challenger   (October 3, 2026) --- My husband and...

HHS Hosts “Haddam Neck in Pictures” October 18th

Submitted by Elizabeth Malloy, Executive Director, Haddam Historical Society   (October...

Essex Foundation Funds Winter Series Library Tickets Program

Submitted by Joan Fox   (October 3, 2026) --- Essex Winter...

Killingworth Conservation Commission Hosts “Energy in Action” October 10th

Submitted by Kate Digianantonio   (October 2, 2026) --- Join the...

What’s Selling in Haddam and Killingworth?

Editor's Note:  The following data on MLS Closed Sales...

Find a Fur Baby (Or Two!) Meet Kelsey and Punch

Submitted by Judith Levin   (October 2, 2026) --- These absolutely...

Boys Soccer 2026: HKHS Notches Third Win of the Week, Defeats Lyme-Old Lyme 4-0

By Carl Cavrell    (October 1, 2026) --- The Haddam-Killingworth High School...

Higganum Man Completes Marathon of a Different Kind: A Race in Connecticut’s 169 Towns

Submitted by Marc Adelberg   (October 1, 2026) --- Connecticut may...
Advertisements

Related Articles

Advertisements
Advertisements
Advertisements