Swing Bridge Update: 90 Day Outlook

Submitted by Sara Mendillo

(January 6, 2024) — American Bridge Company has scheduled the following work activities to occur through March 2024 at the Haddam/East Haddam Swing Bridge (Route 82). Please be advised that while the contractor’s goal is to complete these construction activities on or ahead of schedule, unforeseen circumstances could impact their targeted dates for completion.

Bridge Work
• Rehabilitation of swing span mechanical components, continuous.
• Installation of new control house and equipment, continuous.
• Span 3 & 4 painting, continuous.
• Removal of existing rail and installation of permanent rail, continuous.
• Isolated bridge floor beam repairs.
• Isolated bridge deck panel installation.
• Installation of conduit/wire pull for new bridge electrical equipment, illumination, and cameras, continuous.
• Installation of bridge sidewalk, continuous.
• Bridge balancing and swing span mechanical/electrical operational testing.

Roadway Work
• Roadway work on both sides of the Connecticut River are for the most part on hold while American Bridge concentrates on the Swing Span rehabilitation efforts over the coming months; however, some roadway work could possibly occur.

Single-Lane Bridge
Until March 31, 2024, the bridge will continuously operate as a single-lane bridge. Temporary traffic signals will control the flow of alternating traffic to cross the river. Slight delays at the bridge should be anticipated.

Overnight Closures
American Bridge is anticipating night closures continuously throughout the next three months. If the contractor needs an overnight closure to perform work between now and March 31, 2024, the permissible hours will be as follows:
• Sunday Evening into Monday Morning 7:00 p.m. to 6:00 a.m.
• Monday Evening into Tuesday Morning 7:00 p.m. to 6:00 a.m.
• Tuesday Evening into Wednesday Morning 7:00 p.m. to 6:00 a.m.
• Wednesday Evening into Thursday Morning 7:00 p.m. to 6:00 a.m.
• Thursday Evening into Friday Morning 7:00 p.m. to 6:00 a.m.
• Friday Evening into Saturday Morning 7:00 p.m. to 8:00 a.m.
• Saturday Evening into Sunday Morning 7:00 p.m. to 8:00 a.m.
Be advised that the hours listed for Sunday through Tuesday would pertain only if a 63-hour closure were not occurring.

63-Hour Bridge Closures
The next 63-hour closure will occur January 14, 2024. (weather permitting). Dates for additional 63-hour closures have yet to be determined. American Bridge is
anticipating one or two closures to occur during Spring 2024, with the possibility of additional 63-hour closures if required. The 63-hour closures will be announced to the public a minimum of two weeks in advance of the scheduled dates. Closures will run from Sunday at 8:00 p.m. until Wednesday, no later than 11:00 a.m.

Maritime Advisory
The swing span is currently not open to marine traffic. Openings will resume on April 1, 2024.

Hot this week

Eversource Files for Lower Standard Service Supply Rate

Submitted by Sarah Paduano, Eversource Energy (May 19, 2025) ---...

New in Killingworth: From “Cooking Company” to “AristoKraft Kitchen”

By Clark Judge (February 4, 2026) --- In the spring...

A Tribute to Tom Grasso (1973-2026) Heroic Soldier, Teacher and Coach

By Phil Devlin (May 12, 2026) --- On June 10,...

HVFC Responds to Fiery Crash That Closed Route 9

By Olivia Drake, HVFC Public Information Officer (March 24, 2024)...

Memorial Service Announced for Haddam Man Found in Cockaponset State Forest

By Edith Pawlicki (October 14, 2024) --- A celebration of...

Chenzo’s Restaurant Wins “Best of the Shoreline” Award

By Sharon Challenger   (October 3, 2026) --- My husband and...

HHS Hosts “Haddam Neck in Pictures” October 18th

Submitted by Elizabeth Malloy, Executive Director, Haddam Historical Society   (October...

Essex Foundation Funds Winter Series Library Tickets Program

Submitted by Joan Fox   (October 3, 2026) --- Essex Winter...

Killingworth Conservation Commission Hosts “Energy in Action” October 10th

Submitted by Kate Digianantonio   (October 2, 2026) --- Join the...

What’s Selling in Haddam and Killingworth?

Editor's Note:  The following data on MLS Closed Sales...

Find a Fur Baby (Or Two!) Meet Kelsey and Punch

Submitted by Judith Levin   (October 2, 2026) --- These absolutely...

Boys Soccer 2026: HKHS Notches Third Win of the Week, Defeats Lyme-Old Lyme 4-0

By Carl Cavrell    (October 1, 2026) --- The Haddam-Killingworth High School...

Higganum Man Completes Marathon of a Different Kind: A Race in Connecticut’s 169 Towns

Submitted by Marc Adelberg   (October 1, 2026) --- Connecticut may...
Advertisements

Related Articles

Advertisements
Advertisements
Advertisements