(January 6, 2024) — American Bridge Company has scheduled the following work activities to occur through March 2024 at the Haddam/East Haddam Swing Bridge (Route 82). Please be advised that while the contractor’s goal is to complete these construction activities on or ahead of schedule, unforeseen circumstances could impact their targeted dates for completion.

Bridge Work
• Rehabilitation of swing span mechanical components, continuous.
• Installation of new control house and equipment, continuous.
• Span 3 & 4 painting, continuous.
• Removal of existing rail and installation of permanent rail, continuous.
• Isolated bridge floor beam repairs.
• Isolated bridge deck panel installation.
• Installation of conduit/wire pull for new bridge electrical equipment, illumination, and cameras, continuous.
• Installation of bridge sidewalk, continuous.
• Bridge balancing and swing span mechanical/electrical operational testing.

Roadway Work
• Roadway work on both sides of the Connecticut River are for the most part on hold while American Bridge concentrates on the Swing Span rehabilitation efforts over the coming months; however, some roadway work could possibly occur.

Single-Lane Bridge
Until March 31, 2024, the bridge will continuously operate as a single-lane bridge. Temporary traffic signals will control the flow of alternating traffic to cross the river. Slight delays at the bridge should be anticipated.

Overnight Closures
American Bridge is anticipating night closures continuously throughout the next three months. If the contractor needs an overnight closure to perform work between now and March 31, 2024, the permissible hours will be as follows:
• Sunday Evening into Monday Morning 7:00 p.m. to 6:00 a.m.
• Monday Evening into Tuesday Morning 7:00 p.m. to 6:00 a.m.
• Tuesday Evening into Wednesday Morning 7:00 p.m. to 6:00 a.m.
• Wednesday Evening into Thursday Morning 7:00 p.m. to 6:00 a.m.
• Thursday Evening into Friday Morning 7:00 p.m. to 6:00 a.m.
• Friday Evening into Saturday Morning 7:00 p.m. to 8:00 a.m.
• Saturday Evening into Sunday Morning 7:00 p.m. to 8:00 a.m.
Be advised that the hours listed for Sunday through Tuesday would pertain only if a 63-hour closure were not occurring.

63-Hour Bridge Closures
The next 63-hour closure will occur January 14, 2024. (weather permitting). Dates for additional 63-hour closures have yet to be determined. American Bridge is
anticipating one or two closures to occur during Spring 2024, with the possibility of additional 63-hour closures if required. The 63-hour closures will be announced to the public a minimum of two weeks in advance of the scheduled dates. Closures will run from Sunday at 8:00 p.m. until Wednesday, no later than 11:00 a.m.

Maritime Advisory
The swing span is currently not open to marine traffic. Openings will resume on April 1, 2024.

Hot this week

HVFC Responds to Fiery Crash That Closed Route 9

By Olivia Drake, HVFC Public Information Officer (March 24, 2024)...

Letter to the Editor: In Opposition to Sale of the Rossi Property

The views stated here are those of the authors...

Memorial Service Announced for Haddam Man Found in Cockaponset State Forest

By Edith Pawlicki (October 14, 2024) --- A celebration of...

Nathaniel B. Field Memorial Foundation Wins Grant from Eversource

Submitted by Marie and Howie Field (March 30, 2024) ---...

KCF Receives Grant to Fund College Scholarships for High School Seniors

Submitted by Kathleen Amoia (March 5, 2024) --- The Killingworth...

Swing Bridge Construction Update: Week of May 18, 2025

Submitted by Sara Mendillo (May 18, 2025) — The Connecticut...

River Valley Transit Service Changes Begin May 27th

Submitted by River Valley Transit (May 17, 2025) --- River...

RSD 17 Board of Education Announces Timeline for Second Budget Referendum

Submitted by Jennifer Favalora, RSD 17 Board of Education...

Eversource Marks National Electrical Safety Month

Submitted by Sarah Paduano, Eversource Energy (May 16, 2025) ---...

Find a Fur Baby: (Or Two) Meet Remy and Marlo!

Submitted by Judith Levin (May 16, 2025) --- These two...

Haddam Annual Budget Meeting and Special Meeting May 21st

Submitted by Town of Haddam (May 16, 2025) --- The...
Advertisements

Related Articles

Advertisements
Advertisements
Advertisements